Masthead for magazine that reads INTAKE

April 2025

About this cover: Water crews discharge stagnant water during pipe flushing operations. Nearly 100 miles of distribution pipe was flushed as part of the water quality restoration process in the Pacific Palisades following the wildfires of January 2025. ➔

Open Magazine
Subscribe
Masthead for magazine that reads INTAKE

April 2025

About this cover: Field crews discharge stagnant water during pipe flushing operations. Nearly 100 miles of distribution pipe was flushed as part of the water quality restoration process in the Pacific Palisades following the wildfires of January 2025. ➔

Open Magazine
Subscribe